Title: Award of bid to QRC, Inc. for Fiscal Year (FY) 2018-2019 potable water and reclaimed water repair services.
Attachments: 1. FE Agreement with QRC Inc for Water Repair Services, 2. Bid tabulation, 3. 178-0234-CP Final Agreement, 4. QRC Inc Bid Submittal, 5. 18-111D - Risk Review Annual Potable Water Reclaimed Water Repair Services FINAL VEH.pdf
Related files: 20-1008D, 19-1188A
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Subject:

Title

Award of bid to QRC, Inc. for Fiscal Year (FY) 2018-2019 potable water and reclaimed water repair services.

label

 

Recommended Action:

Recommended Action

Approval of the award of bid to QRC, Inc (QRC) for Fiscal Year 2018-2019 potable water and reclaimed water repair services.

Bid No.178-0234-CP (JJ); PID 2246C; in the amount of $1,982,480.00 on the basis of being the lowest responsive, responsible bid received meeting specifications. All work is expected to be completed within 730 consecutive calendar days. Authorize the Chairman to sign and Clerk of Court to attest.

Body

 

Strategic Plan:

Foster Continual Economic Growth and Vitality
4.4 Invest in infrastructure to meet current and future needs

Deliver First Class Services to the Public and Our Customers
5.2 Be responsible stewards of the public’s resources
5.3 Ensure effective and efficient delivery of county services and support

 

Summary:

The purpose of this contract is to effectuate the repair, rehabilitation, and replacement of potable and reclaimed water pipe at various locations throughout the County. Work includes, but is not limited to: directional drilling; excavation; pipe installation; installation of valves and valve boxes; relocation and/or replacement of fire hydrants; restoration of roadway and disinfection of potable water pipe prior to replacement and/or repair.

 

Background Information:

The contract is based on a work order format where assignments are provided through work orders to the contractor on an as needed basis.  This contract replaces the current contract which was also awarded to QRC.

 

Fiscal Impact:

Expenditure not to exceed: $1,982,480.00

 

Funding is derived from the Capital Improvement Program Water and Sewer Enterprise Fund.

 