Title: Award of bid to Cone & Graham, Inc. for a pedestrian bridge project at Tarpon Woods Boulevard.
Attachments: 1. FE Construction Agreement with Cone & Graham Inc, 2. Project Financial Overview.pdf, 3. Project Location Map.pdf, 4. Agreement.pdf, 5. Bid Tabulation
Related files: 18-872D, 17-930D
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Subject:

Title

Award of bid to Cone & Graham, Inc. for a pedestrian bridge project at Tarpon Woods Boulevard.

label

Recommended Action:

Recommended Action

Approve the award of bid to Cone & Graham, Inc. for a pedestrian bridge project at Tarpon Woods Boulevard over Brooker Creek.

Bid no. 167-0074-CP(DF); PID No. 001334A; in the amount of $760,380.58 on the basis of being the lowest responsive, responsible bid meeting specifications.  All work is to be completed within three hundred (300) consecutive calendar days.  Chairman to sign and Clerk of Court to attest.

Body

Strategic Plan:

Ensure Public Health, Safety and Welfare
2.5 Enhance pedestrian and bicycle safety

Foster Continual Economic Growth and Vitality
4.4 Invest in infrastructure to meet current and future needs

Deliver First Class Services to the Public and Our Customers
5.1 Maximize partner relationships and public outreach
5.2 Be responsible stewards of the public’s resources

 

Summary:

The purpose of this project is to address pedestrian safety with the construction of a bridge over Brooker Creek on the north side of Tarpon Woods Boulevard, east of East Lake Road.  Pedestrians currently use the roadway to walk around this crossing.  The Tarpon Woods Pedestrian Bridge is the third of three (3) County-planned pedestrian improvements for Tarpon Woods Boulevard.

 

Background Information:

Work consists of widening a sidewalk crossing of approximately 110 ft. in length on one (1) side of the current bridge.  The bridge construction includes pilings, pre-stressed slab units and related concrete work.  Additional project construction consists of sidewalk connections including gravity walls, drainage, handrail, curbs, asphalt paving, and related appurtenances.

 

Fiscal Impact:

Total expenditure not to exceed: $760,380.58.

 

Funding will be derived from the Infrastructure Sales Tax (Penny for Pinellas), General Sidewalk and American with Disabilities Act Program allocation.  The associated utility work for this project in the amount of $117,224.00 is budgeted in the Utilities Enterprise Operating Fund.

 

Staff Member Responsible:

Rahim Harji, Director, Public Works
Joe Lauro, Director, Purchasing

 

Partners:

N/A

 

Attachments:

Agreement
Bid Tabulation
Project Financial Overview
Project Location Map