Pinellas County Logo
File #: 18-1147D    Version: 1
Type: Delegated Item Status: Passed
File created: 12/3/2018 Department: Public Works
On agenda: 1/22/2019 Final action: 1/22/2019
Title: Time Only Extension No. 2 to the Local Agency Program Agreement with the Florida Department of Transportation for the Keystone Road shoulder and resurfacing project.
Attachments: 1. AATF'd time extension no. 2.pdf, 2. 436011 1 fully signed time extension no. 1.pdf, 3. Executed Agreement and NTP.pdf, 4. Location Map-KEYSTONE ROAD SHOULDER.pdf
Related files: 17-122A, 18-499D
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Subject:

Title

Time Only Extension No. 2 to the Local Agency Program Agreement with the Florida Department of Transportation for the Keystone Road shoulder and resurfacing project.

label

         

Recommended Action:

Recommended Action

Approval and execution by the County Administrator of the Time Only Extension No. 2 to the Local Agency Program (LAP) Agreement with the Florida Department of Transportation (FDOT) for the Keystone Road shoulder and resurfacing project.

 

                             Six (6) month time only extension for FDOT Financial Project No. 436011 1 58 01, and County PID No. 001769A.

 

      •                     Additional time needed to resolve constructability issue at drainage structure, and for project close-out.

 

      •                     Project substantially complete with the exception of the constructability issue.

 

      •                     Extends agreement from February 19, 2019 to August 15, 2019.

Body

 

Strategic Plan:

Ensure Public Health, Safety, and Welfare
2.5 Enhance pedestrian and bicycle safety

Foster Continual Economic Growth and Vitality
4.4 Invest in infrastructure to meet current and future needs
4.5 Provide safe and effective transportation systems to support the efficient flow of motorists, commerce, and regional connectivity

 

Summary:

The County requested and FDOT granted a six (6) month time only extension for the subject LAP agreement to resolve a constructability issue related to unsuitable materials encountered at a drainage structure, and to allow adequate time for project close-out and final billing to FDOT.

The FDOT granted a six (6) month time extension to prolong the duration of the LAP agreement from February 15, 2019 to August 15, 2019.

 

Background/Explanation:

The Board of County Commissioners approved this grant on March 7, 2017 to partially fund the Keystone Road shoulder and resurfacing project.  Construction activities commenced on August 7, 2017.  Time Extension No. 1 was approved by the County Administrator on June 29, 2018, extending the agreement expiration from August 15, 2018 to February 15, 2019.

The project is substantially complete with the exception of resolving the issue as noted above.  Staff is working with the contractor, the design consultant, and FDOT to resolve the issue, as well as review of the required design modifications.  Design modifications have been narrowed to two options following a meeting with all parties on November 26th, 2018, consisting of guardrail installation at the location, or installation of permanent sheet piling to permit de-mucking and placement of suitable material.

 

Fiscal Impact:

N/A

 

Delegated Authority:

Authority for the County Administrator to sign this time only extension is granted under Code Section 2-62 (a)(2).

 

Staff Member Responsible:

Addie Javed, Director, Public Works

 

Partners:

FDOT

 

Attachments:

Time Extension No. 2