Subject:
Title
Award of bid to Weeks Marine, Inc. for geotextile tube removal and rock groin construction at Upham Beach (companion to item no. 12).
label
Recommended Action:
Recommended Action
Approve the award of bid to Weeks Marine, Inc. for the Geotextile Tube Removal and Rock Groin Construction Project at Upham Beach (re-bid).
Bid no. 156-0489-CP; PID No. 000219 in the amount of $9,535,640.00 on the basis of being the lowest responsive, responsible bid meeting specifications. All work is expected to be completed within four hundred fifty (450) consecutive calendar days. Chairman to sign and Clerk of Court to attest.
Body
Strategic Plan:
Practice Superior Environmental Stewardship
3.1 Implement green technologies and practices where practical
3.2 Preserve and manage environmental lands, beaches, parks, and historical assets
3.3 Protect and improve the quality of our water, air, and other natural resources
Deliver First Class Services to the Public and Our Customers
5.2 Be responsible stewards for the public’s resources
Summary:
The purpose of this project is to slow beach erosion and provide storm protection to upland infrastructure and property at Upham Beach, located on Long Key in the City of St. Pete Beach.
The new rock structures should reduce the required frequency of nourishment projects, thus reducing the long-term cost of maintaining a viable sandy beach. The five (5) geotextile groins currently in place have been vandalized and damaged, and are no longer providing the necessary protection.
Background Information:
Work consists of the removal of five (5) existing geotextile T-groins and associated debris and the installation of four (4) rock T-groins.
This project was originally advertised in February 2016 resulting in one bid submittal; the submittal was rejected by the County Administrator on June 30, 2016 due to lack of competition. The re-bid specifications were revised to provide flexibility on rock type and transport methods resulting in two responsive and responsible bid submittals.
The geotextile T-groins served as a temporary proof of concept. Once their benefit was demonstrated, permits were approved for the permanent rock T-groins. There have been three (3) major repairs totaling $934,111 to the geotextile T-groins since their installation. The permanent rock structures have minimal maintenance requirements.
The two nourishments prior to the T-groin installation placed an average of 360,000 CY of sand per project. After the installation of the T-groins, the average has been 160,000 CY of sand per project. This reduction in sand saved an estimated $3.4M.
Fiscal Impact:
Total expenditure not to exceed: $9,535,640.00
Funding is derived from the Tourist Development Tax (50%) and a Florida Department of Environmental Protection grant (50%). The grant agreement is item 12 on today’s Board of County Commissioners Agenda.
Staff Member Responsible:
Bill Breckinridge, Assistant County Administrator
Joe Lauro, Director, Purchasing