Pinellas County Florida Banner
File #: 23-0257A    Version: 1
Type: Contract/Agreement Status: Passed
File created: 2/15/2023 Department: Public Works
On agenda: 4/25/2023 Final action: 4/25/2023
Title: State funded Grant Agreement, including associated Resolution and Maintenance Memorandum of Agreement with the Florida Department of Transportation, providing construction and construction engineering inspection for the Advanced Traffic Management System /Intelligent Transportation System project on State Road 586/Causeway Boulevard/Curlew Road from the Honeymoon Park entrance to U.S. 19.
Attachments: 1. FE_448513 1 SR 586-Causeway ATMS CIGP Agreement_G2L65, 2. FE_448513 SR 586.Causeway Blvd.Curlew Rd Executed MMOA, 3. ADOPTED RES. 23-28, 4. PE_Maintenance Memorandum of Agreement_Unexecuted, 5. PE_AATF - Agreement with Attachments A-D, F, J, O, 6. AATF - Agreement with Attachments A-D, F, J, O, 7. Resolution, 8. Maintenance Memorandum of Agreement, 9. Project Location Map, 10. Resolution 06-70, 11. OMB.REVIEW_23-0257A_23-0253A_004541A North County ATMS PH2
Related files: 23-1845A

Subject:

Title

State funded Grant Agreement, including associated Resolution and Maintenance Memorandum of Agreement with the Florida Department of Transportation, providing construction and construction engineering inspection for the Advanced Traffic Management System /Intelligent Transportation System project on State Road 586/Causeway Boulevard/Curlew Road from the Honeymoon Park entrance to U.S. 19.

label

 

Recommended Action:

Recommended Action

Approval of the State funded Grant Agreement, including associated Resolution (Exhibit D) and Maintenance Memorandum of Agreement (MMOA) with the Florida Department of Transportation (FDOT), providing construction and construction engineering inspection (CEI) for the Advanced Traffic Management System/Intelligent Transportation System project on State Road 586/Causeway Boulevard/Curlew Road from the Honeymoon Park entrance to U.S. 19.

 

                     Agreement provides $502,000.00 in state funding, contributing twenty-two percent for the project construction and CEI.

                     County match is $1,771,345.00 (seventy-eight percent) and total project estimate is $2,273,345.00.

                     The County match for this Agreement is budgeted in Capital Project 004541A (North County ATMS Phase 2) funded by Local Option Fuel Tax (LOFT).

                     Project consists of installation of fiber optic cable, closed circuit television cameras, and dynamic message signs.

                     Project will enhance flow of traffic by providing necessary surveillance of traffic conditions along the roadway, and provide motorists with information for alerts, incidents, and evacuations.

                     FDOT requires an MMOA, to be signed in conjunction with the Agreement to address future maintenance responsibilities for all fiber optic cable and ATMS devices installed including those within the Department’s right of way.

                     Board of County Commissioners is required to approve the Agreement by Resolution.

                     Funding is from the FDOT County Incentive Grant Program twenty-two percent and LOFT seventy-eight percent.

                     County is investigating the eligibility of ITS/ATMS projects for funding through ARPA to replace or add to the LOFT funds. Project will not be advertised for construction until that determination is made.

                     Construction completion is expected in January 2025. 

 

FDOT FPN 448513 1 54 01; FDOT CIGP funding not to exceed $502,000.00; County contribution is $1,771,345.00 and total project estimate is $2,273,345.00; Agreement term expires May 13, 2025; MMOA has no expiration; Authorize the Chairman to sign and the Clerk of the Circuit Court to attest.

Body

 

Strategic Plan:

Ensure Public Health, Safety, and Welfare
2.1 Provide planning, coordination, prevention, and protective services to ensure a safe and secure community

Foster Continual Economic Growth and Vitality
4.4 Invest in infrastructure to meet current and future needs
4.5 Provide safe and effective transportation systems to support the efficient flow of motorists, commerce, and regional connectivity

Deliver First Class Services to the Public and Our Customers
5.2 Be responsible stewards of the public’s resources
5.3 Ensure effective and efficient delivery of county services and support

 

Summary:

Summary

The County Incentive Grant Program (CIGP) Agreement provides state funding of twenty-two percent (22%) of the construction and CEI funding required for the installation of ATMS/ITS on SR 586/Causeway Blvd/Curlew Rd from Honeymoon Park Entrance to US 19, in the amount of $502,000.00. Total project estimate is $2,273,345.00. Project scheduled for completion by January 13, 2025.

Project will enhance flow of traffic by providing necessary surveillance of traffic conditions along the roadway, and provide motorists with information for alerts, incidents and evacuations. Total project length is approximately five point two (5.2) miles. The project consists of new installation of fiber optic cable, CCTV cameras, and dynamic message signs (DMS).  The MMOA is a requirement of the Agreement and defines County maintenance responsibilities once the project is constructed.

Body

 

Background Information:

The project is part of an overall implementation of the Countywide ATMS/ITS effort that was adopted and funded by the Board of County Commissioners (Board) utilizing the Ninth Cent Local Option Fuel Tax (LOFT) in 2006.

Section 14 of the Agreement requires the County to indemnify and hold harmless the FDOT to the extent permitted by law as limited by and pursuant to the provisions of Section 768.28, Florida Statutes. County Resolution No. 06-70 prohibits the County from indemnifying others under most circumstances. FDOT will not modify the indemnification section of this Agreement as this is a standard requirement in their agreements. Staff and the County Attorney agree that the FDOT indemnification requirement is within an acceptable level of risk.

 

Fiscal Impact:

The County match for this Agreement is budgeted in the Capital Improvement Program, under project 004541A North County ATMS Phase 2 funded by Local Option Fuel Tax (LOFT) at seventy-eight percent (78%). The FDOT CIGP participation provides the remaining funding twenty-two percent (22%).  If the project is determined eligible for funding through ARPA, funds from projects that may not make the ARPA deadline requirements may be transferred to this project to replace or add to the LOFT funding.

 

LOFT: $1,771,345.00

CIGP: $502,000.00

Total Project Estimate: $2,273,345.00.

 

Staff Member Responsible:

Kelli Hammer Levy, Director, Public Works

 

Partners:

FDOT

 

Attachments:

Agreement with Exhibit A-D, F, J, O
Resolution
MMOA
Project Location Map
Resolution 06-70