File #: 22-2234A    Version: 1
Type: Contract/Agreement Status: Passed
File created: 12/2/2022 Department: Public Works
On agenda: 1/17/2023 Final action: 1/17/2023
Title: County Incentive Grant Program Agreement with the Florida Department of Transportation and associated Resolution for engineering, planning, and environmental services for the Forest Lakes Boulevard Phase III Widening Design between State Road 580 and State Road 584 (Tampa Road).
Attachments: 1. 443412 1 Forest Lakes Blvd CIGP agreement F.E. and NTP, 2. PE_AATF - Agreement, 3. Adopted RES 23-4, 4. AATF - Agreement, 5. Exhibit D - Resolution, 6. Resolution 06-70, 7. Project Location Map
Related files: 20-1822A

Subject:

Title

County Incentive Grant Program Agreement with the Florida Department of Transportation and associated Resolution for engineering, planning, and environmental services for the Forest Lakes Boulevard Phase III Widening Design between State Road 580 and State Road 584 (Tampa Road).

label

 

Recommended Action:

Recommended Action

Approval of the County Incentive Grant Program (CIGP) Agreement with the Florida Department of Transportation (FDOT) and associated Resolution for engineering, planning, and environmental services for Project 003914A Forest Lakes Boulevard Phase III Widening Design between State Road (SR) 580 and SR 584 (Tampa Road).

 

                     Agreement provides $448,600.00 in FDOT funding. County match is $448,600.00.  Total Agreement amount is $897,200.00.

                     Project will widen Forest Lakes Boulevard between SR 580 and SR 584 (Tampa Road) upgrading the typical section from two lane undivided to four lanes with a center two-way left turn lane and bike lanes.

                     Funding is derived from FDOT CIGP (50%) and Local Infrastructure Sales Tax (Penny for Pinellas) (50%). 

                     Design is scheduled for completion June 18, 2027.

 

FDOT FPN 443412 1 34 01; PID No. 003914A; FDOT CIGP funding not to exceed $448,600.00; Total Agreement amount is $897,200.00; Agreement term expires June 18, 2027; Authorize the Chairman to sign and the Clerk of the Circuit Court to attest.

Body

 

Strategic Plan:

Ensure Public Health, Safety, and Welfare
2.1 Provide planning, coordination, prevention, and protective services to ensure a safe and secure community.

Foster Continual Economic Growth and Vitality
4.4 Invest in infrastructure to meet current and future needs
4.5 Provide safe and effective transportation systems to support the efficient flow of motorists, commerce, and regional connectivity

 

Summary:

Summary

This Agreement provides fifty percent (50%) of design funding required for engineering, planning, and environmental services for the Forest Lakes Boulevard Phase III Widening Design between SR 580 and SR 584 (Tampa Road). Grant funding from FDOT is in the amount of $448,600.00. Total Agreement amount is $897,200.00.  The project will widen Forest Lake Boulevard between SR 580 and SR 584 (Tampa Road) upgrading the typical section from two lane undivided to four lanes with a center two-way left turn lane and bike lanes. The Agreement expiration is June 18, 2027. 

Body

 

Background Information:

The project includes drainage, signing, pavement marking, two (2) new mast arms and pedestrian improvements in the form of six (6) foot wide sidewalk and a ten-foot-wide trail segment (west side, between SR 580 and the railroad tracks). As part of the project, an additional eastbound left turn lane will be provided on west leg of SR 580 at Forest Lakes Boulevard and a southbound through lane on the north leg of Forest Lakes Boulevard at Tampa Road. The south leg of Forest Lakes Boulevard at SR 580 will also be restriped.

Section 14 of the Agreement requires the County to indemnify and hold harmless the FDOT to the extent permitted by law as limited by and pursuant to the provisions of Section 768.28, Florida Statutes.  County Resolution No. 06-70 prohibits the County from indemnifying others under most circumstances.  FDOT will not modify the indemnification section of this agreement as this is a standard requirement in their agreements.  Staff and the County Attorney agree that the FDOT indemnification requirement is within an acceptable level of risk.

 

Fiscal Impact:

The County match for this Agreement is budgeted in the Capital Improvement Program, under project 003914A Forest Lakes Boulevard from SR 580 to SR 584 (Tampa Road) and is derived from the Local Infrastructure Sales Surtax (Penny for Pinellas) (50%) funds.  The total amount budgeted by the County for design is $1,069,000.00.  The FDOT CIGP participation provides up to $448,600.00, which equates of (50%) of the Agreement amount.

 

Penny for Pinellas:  $448,600.00

CIGP:   $448,600.00

Total Agreement amount:  $897,200.00

Total design budget: $1,096,000.00

 

Staff Member Responsible:

Kelli Hammer Levy, Director, Public Works

 

Partners:

FDOT

 

Attachments:

Agreement
Exhibit D - Resolution
Resolution 06-70
Project Location Map