Pinellas County Florida Banner
File #: 22-1937A    Version: 1
Type: Contract/Agreement Status: Passed
File created: 10/20/2022 Department: Public Works
On agenda: 11/15/2022 Final action: 11/15/2022
Title: County Incentive Grant Program Agreement with the Florida Department of Transportation and associated Resolution for design of the Advanced Traffic Management System / Intelligent Transportation System Project on Alderman Road from Alternate U.S. Highway 19 to U.S. Highway 19.
Attachments: 1. FDOT-FPN 448510-CIGP_Agreement-FE, 2. PE_AATF - Agreement, 3. Adopted RES 22-102, 4. AATF - Agreement, 5. AATF - Exhibit D - Resolution, 6. Project Location Map, 7. Resolution 06-70, 8. OMB.CONTRACT.RVW-PW-22-1937A

Subject:

Title

County Incentive Grant Program Agreement with the Florida Department of Transportation and associated Resolution for design of the Advanced Traffic Management System / Intelligent Transportation System Project on Alderman Road from Alternate U.S. Highway 19 to U.S. Highway 19.

label

 

Recommended Action:

Recommended Action

Approval of the County Incentive Grant Program (CIGP) Agreement with the Florida Department of Transportation (FDOT) and associated Resolution for design of the Advanced Traffic Management System/Intelligent Transportation System project on Alderman Road from Alternate U.S. Highway 19 to U.S. Highway 19.

 

                     Agreement provides $185,000.00 in FDOT funding, contributing fifty percent required for design.

                     County match is $185,000.00 and total design estimate is $370,000.00.

                     Project design will include fiber optic communication, dynamic message signs and CCTV cameras.

                     Project will enhance flow of traffic by providing necessary surveillance of traffic conditions along the roadway, and provide motorists with information for alerts, incidents, and evacuations. 

                     Funding is derived from FDOT CIGP (50%) and Local Option Fuel Tax (50%). 

                     Design is scheduled for completion November 24, 2024.



FDOT FPN 448510 1 34 01; PID No. 004543A; FDOT CIGP funding not to exceed $185,000.00; Total design estimate is $370,000.00; Agreement term expires April 19, 2025; Authorize the Chairman to sign and the Clerk of the Circuit Court to attest.

Body

 

Strategic Plan:

Ensure Public Health, Safety, and Welfare
2.1 Provide planning, coordination, prevention, and protective services to ensure a safe and secure community

Foster Continual Economic Growth and Vitality
4.4 Invest in infrastructure to meet current and future needs
4.5 Provide safe and effective transportation systems to support the efficient flow of motorists, commerce, and regional connectivity

 

Summary:

Summary

This Agreement provides fifty percent (50%) of the engineering design funding required for the installation of ATMS/ITS on Alderman Road from Alternate U.S. 19 to U.S. 19 in the amount of $185,000.00. Total design estimate is $370,000.00.  Design is scheduled for completion by November 24, 2024. 

This project will enhance the flow of traffic through video detection and provide necessary surveillance of traffic conditions along the roadway, and provide motorists with information for alerts, incidents, and evacuations. Total project length is approximately two (2) miles.  The project design will include fiber optic communication, dynamic message signs and CCTV cameras.

Body

 

Background Information:

The project is part of an overall implementation of the Countywide ATMS/ITS effort that was adopted and funded by the Board of County Commissioners (Board) utilizing the Ninth Cent Local Option Fuel Tax (LOFT) in 2006. 

Section 14 of the Agreement requires the County to indemnify and hold harmless the FDOT to the extent permitted by law as limited by and pursuant to the provisions of Section 768.28, Florida Statutes.  County Resolution No. 06-70 prohibits the County from indemnifying others under most circumstances.  FDOT will not modify the indemnification section of this agreement as this is a standard requirement in their agreements.  Staff and the County Attorney agree that the FDOT indemnification requirement is within an acceptable level of risk.

 

Fiscal Impact:

The County match for this agreement is budgeted in the Capital Improvement Program, under project 004543A Alderman Road ATMS, in the Advanced Traffic Management System program, and is derived from LOFT (50%) funds.  The FDOT CIGP participation provides the remaining funding (50%).  Future construction will be funded in the same manner.

 

LOFT:  $185,000.00

CIGP:   $185,000.00

Total Design Estimate:  $370,000.00

 

Staff Member Responsible:

Kelli Hammer Levy, Director, Public Works

 

Partners:

FDOT

 

Attachments:

Agreement
Exhibit D - Resolution
Project Location Map
Resolution No. 06-70