File #: 19-825A    Version: 1
Type: Contract/Agreement Status: Passed
File created: 5/15/2019 Department: Public Works
On agenda: 4/7/2020 Final action: 4/7/2020
Title: Award of bid to Kamminga & Roodvoets, Inc. for the Hercules Avenue Phase II Sidewalk from Sherwood Street to Sunset Point Road.
Attachments: 1. FE Construction Agreement with Kamminga & Roodvoets Inc, 2. Location Map, 3. Bid Tabulation
Related files: 21-1371D
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Subject:

Title

Award of bid to Kamminga & Roodvoets, Inc. for the Hercules Avenue Phase II Sidewalk from Sherwood Street to Sunset Point Road.

label

 

Recommended Action:

Recommended Action

Approval of the award of bid to Kamminga & Roodvoets, Inc. for the Hercules Avenue Phase II Sidewalk from Sherwood Street to Sunset Point Road.

 

                     This project consists of ADA (Americans with Disabilities Act) compliant sidewalks on both sides of Hercules Avenue North, piping existing ditches, new pedestrian bridge, concrete box culvert extension, drainage and intersection improvements from Sherwood Street to Sunset Point Road in Clearwater.

                     Additionally, project activities include utility replacement work for the City of Clearwater.

                     Two bids were received with award recommendation to the lowest responsive responsible bid Kamminga & Roodvoets, Inc. in the amount of $2,742,317.04.

                     County small business enterprise program requirements were not included in the invitation to bid document due to grant requirements that prohibit local preference on contracts that receive federal funding.

                     All work is expected to be completed within 365 consecutive calendar days from notice to proceed.

 

Bid No. 189-0385-CP(PLU); PID No. 002686A; in the amount of $2,742,317.04 as the lowest responsive, responsible bid received meeting specifications. All work is expected to be completed within 365 consecutive calendar days. Authorize the Chairman to sign and the Clerk of the Circuit Court to attest.

Body

 

Strategic Plan:

Foster Continual Economic Growth and Vitality
4.4 Invest in infrastructure to meet current and future needs

Deliver First Class Services to the Public and Our Customers
5.3 Ensure effective and efficient delivery of county services and support

 

Summary:

The sidewalk improvements on Hercules Avenue North consists of constructing ADA compliant sidewalks on both sides of Hercules Avenue North, piping existing ditches, pedestrian bridge, concrete box culvert extension, drainage and intersection improvements from Sherwood Street to Sunset Point Road. The upgrades at the intersection of Hercules Avenue North and Calumet Street include traffic mast arms, pedestrian signals, crosswalks, and sidewalk ramps.

Additionally, the City of Clearwater entered into a Joint Project Agreement (JPA) with the County for the purpose of the County’s contractor performing the City’s utility replacement work as part of this contract.  The City’s utility work consists of the replacement of a twelve-inch (12") water main, eight-inch (8") water main, and eight-inch (8") gravity sanitary sewer pipe and associated manholes that are in conflict with the County’s project.  The City will place on deposit with the County advanced funding to compensate the contractor for the City’s portion of work.

 

Background Information:

Public Works identified the need for sidewalk improvements on Hercules Avenue North. Phase I from the railroad tracks to Sherwood Street was completed in 2017. This project, Phase II from Sherwood Street to Sunset Point Road, includes sidewalk improvements along the north and south sides of Hercules Avenue North to provide continuous connectivity and a safe walking environment compliant with current standards and ADA requirements. The intersection upgrades will improve safety, provide operational improvements, reduce the frequency of crashes, and provide pedestrian and bicyclist features.  The overall project will provide increased multimodal safety to motorists, pedestrians, and bicyclists.

 

Fiscal Impact:

Expenditure not to exceed:                                                                                                                                                   $2,742,317.04

 

Funding sources for construction of this project are:

 

Local Agency Program grant agreement administered by FDOT:                     $1,443,956.00

Capital Improvement Program - Sidewalk Projects (Penny                                          $   749,918.04

  for Pinellas):

JPA with the City of Clearwater for utility work:                                                                                    $   548,443.00

Total:                                          $2,742,317.04

 

Staff Member Responsible:

Kelli Hammer Levy, Director, Public Works
Merry Celeste, Division Director, Purchasing and Risk Management, Administrative Services

 

Partners:

Florida Department of Transportation (FDOT)
City of Clearwater

 

Attachments:

Agreement
Bid Tabulation
Location Map