File #: 20-145A    Version: 1
Type: Contract/Agreement Status: Passed
File created: 1/17/2020 Department: Public Works
On agenda: 3/10/2020 Final action: 3/10/2020
Title: Supplemental Agreement No. 1 to the Florida Shared-Use Nonmotorized Trail Network Agreement with the Florida Department of Transportation for funding to complete the north end of the Pinellas Trail Loop.
Attachments: 1. FE 1st Amendment to Trail Network Agreement with FDOT, 2. Project Location Map - Final, 3. AATF - State-Funded Grant Supplemental No. 1, 4. 003682A_Trail Projects Budget, 5. 000967A_PinellasTrailLoopNorthSegmentBudget, 6. OMB_CONTRACT.RVW-PW-TRS-PinellasTrailLoopNorthSegment, 7. Staff Report, 8. Agreement, 9. Exhibit D, 10. Exhibit B
Related files: 17-274A, 16-2015A

Subject:

Title

Supplemental Agreement No. 1 to the Florida Shared-Use Nonmotorized Trail Network Agreement with the Florida Department of Transportation for funding to complete the north end of the Pinellas Trail Loop.

label

 

Recommended Action:

Recommended Action

Approval of Supplemental No. 1 Agreement to the Florida Shared-Use Nonmotorized Trail Network Agreement with the Florida Department of Transportation (FDOT) for funding to complete the north end of the Pinellas Trail Loop.

 

                     Total commitment by FDOT is increased from $5,700,00.00 to $6,200,000.00.

                     Agreement term is revised to December 31, 2022.

 

FDOT FPN No. 440093 1 54 01 for grant funding in the amount of $6,200,000.00; Authorize the Chairman to sign and the Clerk of the Circuit Court to attest.

Body

 

Strategic Plan:

Ensure Public Health, Safety, and Welfare
2.5 Enhance pedestrian and bicycle safety

Foster Continual Economic Growth and Vitality
4.4 Invest in infrastructure to meet current and future needs
4.5 Provide safe and effective transportation systems to support the efficient flow of
motorists, commerce, and regional connectivity
4.6 Support a vibrant community with recreation, arts, and culture to attract residents
and visitors

Deliver First Class Services to the Public and Our Customers
5.1 Maximize partner relationships and public outreach
5.2 Be responsible stewards of the public’s resources

 

Summary:

Summary

This Supplemental No. 1 Amendment to the Agreement is necessary to provide additional grant funding toward the completion of design and construction of the north end of the Pinellas Trail Loop.  Construction, design and material costs have increased and thus are greater than originally anticipated.  The County was originally approved for $5,700,000.00 from Florida Department of Transportation (FDOT) to complete the 9.6 miles of the north gap of the Pinellas Trail.  Supplemental No. 1 amends the agreement amount to $6,200,000.00. Additionally, the expiration term of the agreement is revised from June 1, 2020 to December 31, 2022.

As part of the Supplemental No. 1 amendment to the Agreement, Exhibit B and Exhibit D are replaced.  Exhibit B is a Schedule of Financial Assistance. Exhibit D is concerned with the State Financial Assistance (Florida Single Audit Act).

Body

 

Background Information:

The application for grant funding was approved by the Board on June 21, 2016 and the agreement with FDOT was approved on March 7, 2017.  Approval of ranking and execution of an agreement with Cone & Graham, Inc. for design build services for the Pinellas Loop North Segment - Shared Use Non-Motorized Trail Program by the BCC took place on March 20, 2018.

The County and Forward Pinellas have adopted the Countywide Trailways Plan that includes a 75-mile trail loop.  There are two (2) remaining gaps in the Pinellas Trail Loop. The north gap will be completed with financial assistance provided through this grant opportunity. The north gap of the Trail is 9.6 miles in length and will connect the northern terminus of the Pinellas Trail Loop to the existing segment of the Duke Energy Trail.  The south gap is 8.9 miles in length and will connect the North Bay Trail with the existing segment of the Duke Energy Trail.

FDOT will be constructing approximately two (2) miles of trail as a component of an existing road project.

 

Fiscal Impact:

The total estimated cost to complete the north end of the Pinellas Trail Loop is revised from $8 million to $13,339,868.  The County will provide the difference of $7,139,868 which increases from $2,300,000.00 and is budgeted in the County’s Capital Improvement Program.  The funding source for the County’s portion will be derived from the Local Infrastructure Sales Tax (Penny for Pinellas):   Roads, Bridges, and Trails Penny category, PID No. 000967A Pinellas Trail Loop North Segment and PID No. 003682A Trail Projects. The current project budget will need to be revised during the Fiscal Year 2021 budget process to add the additional grant funds and move the funding from PID No., 003682A to PID No. 000967A.

 

Staff Member Responsible:

Kelli Hammer Levy, Director, Public Works

 

Partners:

FDOT
Florida Department of Environmental Protection
Forward Pinellas
City of Clearwater
Duke Energy

 

Attachments:

Supplemental No. 1
Exhibit B
Exhibit D
Agreement
Project Location Map