File #: 18-1165A    Version: 1
Type: Contract/Agreement Status: Passed
File created: 7/20/2018 Department: Public Works
On agenda: 8/21/2018 Final action: 8/21/2018
Title: Selection of the preferred alternative to complete the Project Development and Environment study for the Dunedin Causeway Bridges project.
Attachments: 1. PPT 6-12-18.pdf
Related files: 18-1196A

Subject:

Title

Selection of the preferred alternative to complete the Project Development and Environment study for the Dunedin Causeway Bridges project.

label

 

Recommended Action:

Recommended Action

Approve the mid-level movable alternative to complete the Project Development and Environment (PD&E) study for the Dunedin Causeway Bridges project, County PID No. 000423A.

Body

 

Strategic Plan:

Ensure Public Health, Safety, and Welfare
2.5 Enhance pedestrian and bicycle safety
Foster Continual Economic Growth and Vitality

4.4 Invest in infrastructure to meet current and future needs
4.5 Provide safe and effective transportation systems to support the efficient flow of motorists, commerce, and regional connectivity

 

Summary:

This action is necessary to complete the PD&E process, and to seek state and federal funding opportunities for replacement of the Dunedin Causeway bridges.  Selection of the preferred alternative does not obligate the County to construct the alternative, but allows the process to move forward.

 

Background Information:

On the June 12, 2018 Work Session, the project team presented the results of the Sea Level Rise (SLR) analysis using the recommendations provided by the Tampa Bay Climate Science Advisory Panel (CSAP), and provided a general update of the project status.

As a result of the presentation at the June 12th Work Session, consensus was achieved by the Board for the mid-level movable main bridge, which is in alignment with the preferred alternative selected by the City of Dunedin and the general public.

Summary of tasks to be performed upon approval of the preferred alternative:
                     Update environmental impacts since the original evaluation and data collection
                     Coordinate with the Florida Department of Transportation (FDOT) Central Office for compliance with the National Environmental Policy Act (NEPA) since these duties have been reassigned from Federal Highway Authority (FHWA)
                     Complete the Engineering and Environmental Analysis and Reports
                     Conduct a Public Hearing

 

Fiscal Impact:

Anticipated costs for future replacement of the Dunedin Causeway bridges (main bridge and tide relief bridge):

 

Alternative

Cost

Annual Operation & Maintenance

Service Life

Mid-level Movable

$81.2 M

$231 K

75 years

 

 

Staff Member Responsible:

Rahim Harji, Assistant County Administrator

 

Partners:

City of Dunedin
Dunedin Ad Hoc Advisory Committee
Forward Pinellas Bicycle Pedestrian Advisory Committee
Forward Pinellas Citizens Advisory Committee
Forward Pinellas Technical Coordinating Committee

 

Attachments:

N/A