Pinellas County Florida Banner
File #: 17-1925A    Version: 1
Type: Grant Related Item Status: Passed
File created: 10/27/2017 Department: Public Works
On agenda: 12/12/2017 Final action: 12/12/2017
Title: Local Agency Program Agreement with the Florida Department of Transportation for the Haines-Bayshore Road Project, from U.S. 19 North to Sunrise Boulevard.
Attachments: 1. FE Local Agency Propgram Agreement with FDOT, 2. PE Local Agency Agreement with FDOT, 3. Adopted RES 17-89, 4. Agreement, 5. Location Map_HAINES BAYSHORE RD SIDEWALK IMPROVEMENTS.pdf
Related files: 17-1996A

Subject:

Title

Local Agency Program Agreement with the Florida Department of Transportation for the Haines-Bayshore Road Project, from U.S. 19 North to Sunrise Boulevard.

label

 

Recommended Action:

Recommended Action

Local Agency Program (LAP) Agreement, and accompanying Resolution with the Florida Department of Transportation (FDOT) for the Haines-Bayshore Road project, from U.S. 19 North to Sunrise Boulevard.  Chairman to sign and the Clerk of the Circuit Court to attest the Agreement.

FDOT FPN: 424564 6 58/68 01, County PID No. 002102A, providing $740,580 in construction grant funding.

Body

 

Strategic Plan:

Ensure Public Health, Safety, and Welfare
2.5 Enhance pedestrian and bicycle safety

Foster Continual Economic Growth and Vitality
4.4 Invest in infrastructure to meet current and future needs

Deliver First Class Services to the Public and Our Customers
5.1 Maximize partner relationships and public outreach

 

Summary:

Approval of this grant will provide 100% of the funding necessary to pay for construction activities, as well as construction engineering inspection (CEI) services for the Haines-Bayshore Road sidewalk improvement project, from U.S. 19 North to Sunrise Boulevard.

 

Background Information:

This project provides for construction of concrete sidewalk to fill the gaps on the south side of Haines-Bayshore Road, between U.S. 19 and Sunrise Boulevard (approximately 3,000 linear feet), and also adds a 6 foot shoulder to the south side of Haines-Bayshore Road.  Sidewalk construction will be 10 feet wide from east of U.S. 19 to the western entrance of Clearwater Central Catholic High School, and will be 5 feet wide from Oak Street to Sunrise Boulevard.  Construction of this project will provide connectivity to the future Pinellas Trail segment extending from Haines-Bayshore to Whitney-Wolford Road.  County staff is currently in the process of seeking grant funding from FDOT for construction of this segment of Trail.

The FDOT also provided design funding for this project.  Design activities are complete, and the project will be entering the bid phase upon full execution of this Agreement and issuance of a notice to proceed from FDOT.  Right-of-way requirements and right-of-way certification have been completed by the County and accepted by FDOT as part of the design process.  Construction activities are anticipated to commence in the summer of 2018, and expected to be completed prior to December 31, 2018.  

 

Fiscal Impact:

Funding for this project is budgeted in the Capital Improvement Program: Transportation and Traffic Flow, Sidewalk Projects program allocation.  The source of funding is provided by a federal pass-through grant administered by the FDOT through this LAP Agreement.  The LAP Agreement is providing up to $740,580, or 100% of the funding necessary to complete construction of this project on a reimbursement basis.

 

Staff Member Responsible:

Rahim Harji, P.E., Director, Public Works

 

Partners:

FDOT

 

Attachments:

Agreement with Resolution
Project Location Map