File #: 16-1803A    Version: 1
Type: Contract/Agreement Status: Passed
File created: 10/5/2016 Department: Utilities
On agenda: 1/24/2017 Final action: 1/24/2017
Title: Award of bid to T.L.C. Diversified, Inc. for headworks modifications at the W.E. Dunn Water Reclamation Facility.
Attachments: 1. FE Construction Agreement with T L C Diversified Inc, 2. Agreement.pdf, 3. Project Location Map.pdf, 4. Bid Tabulation Summary.pdf
Related files: 18-1133D, 18-1070D
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Subject:

Title

Award of bid to T.L.C. Diversified, Inc. for headworks modifications at the W.E. Dunn Water Reclamation Facility.

label

Recommended Action:

Recommended Action

Approve the award of bid to T.L.C. Diversified, Inc. for headworks modifications at the W.E. Dunn Water Reclamation Facility.

Bid no. 167-0036-CP(DF); PID No. 002206A; in the amount of $2,030,777.00 on the basis of being the lowest responsive, responsible bid meeting specifications.  All work is expected to be completed within three hundred sixty five (365) consecutive calendar days.  Chairman to sign and Clerk of Court to attest.

Body

Strategic Plan:

Foster Continual Economic Growth and Vitality
4.4 Invest in infrastructure to meet current and future needs

Deliver First Class Services to the Public and Our Customers
5.2 Be responsible stewards of the public’s resources
5.3 Ensure effective and efficient delivery of county services and support

 

Summary:

This project will furnish and install three (3) new bar screens and compactors within the existing headworks facility at the W.E. Dunn Water Reclamation Plant.  New screens will improve removal of fibrous material, which is harmful to plant machinery, from the wastewater stream.  Additional work includes construction of a concrete splitter box which will equalize flow and prevent wastewater from incorporating air and producing harmful sewer gases.  These sewer gases cause premature pipe failure.

 

Background Information:

Phase 1 of this project is currently under construction at the Dunn facility; estimated completion date is April 2017. The scope of the Phase 1 project is to replace and rehabilitate deteriorated pipe and make improvements to facility operations including installation of the valves and fittings necessary to facilitate construction of Phase 2 of this project, to be hereby awarded, with minimal interruption to plant operations.  Upon completion of Phase 2 in approximately May 2018, all current planned modifications to the W.E. Dunn Headworks shall be complete.

 

Fiscal Impact:

Total expenditure not to exceed: $2,030,777.00

 

Funding will be derived from the Utilities Department enterprise fund.

 

Staff Member Responsible:

Randi Kim, Director, Utilities
Joe Lauro, Director, Purchasing

 

Partners:

N/A

 

Attachments:

Agreement
Bid Tabulation