File #: 21-1371D    Version: 1
Type: Purchasing Delegated Item Status: Passed
File created: 11/9/2021 Department: Public Works
On agenda: 12/31/2021 Final action: 2/22/2022
Title: Change Order No. 1 (final) to the contract with Kamminga & Roodvoets, Inc. for the Hercules Avenue Phase II Sidewalk from Sherwood Street to Sunset Point Road
Attachments: 1. Change Order No. 1 (final)
Related files: 19-825A
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Subject:

Title

Change Order No. 1 (final) to the contract with Kamminga & Roodvoets, Inc. for the Hercules Avenue Phase II Sidewalk from Sherwood Street to Sunset Point Road

label

         

Recommended Action:

Recommended Action

Approval and execution by the County Administrator of Change Order No. 1 (final) with Kamminga & Roodvoets, Inc. for the Hercules Avenue Phase II Sidewalk from Sherwood Street to Sunset Point Road

 

                     This project was for sidewalk improvements consisting of ADA (Americans with Disabilities Act) on both sides of Hercules Avenue North, new pedestrian bridge, concrete box culvert extension, and drainage and intersection improvements from Sherwood Street to Sunset Point Road in Clearwater.

                     Change Order No. 1 (final) decreases the contract amount by ($131,223.71) resulting from the difference between original estimated and final quantities used and the balance of unspecified work not used - all attributed to the City of Clearwater’s portion of utility replacement work via a Joint Project Agreement (JPA).

                     The project also required a 130-day extension due to unforeseen field conditions beyond the contractor’s control, for a revised total contract duration of 495 consecutive calendar days

                     This project was awarded by the Board of County Commissioners (Board) on April 7, 2020 in the amount of $2,742,317.04 with substantial completion achieved on July 26, 2021

 

Contract No. 189-0385-CP(JJ); PID No. 002686A; decrease the contract amount by ($131,223.71) for a revised total amount of $2,611,093.33; agreement term increases by 130 consecutive calendar days for a revised total duration of 495 consecutive calendar days.

Body

 

Strategic Plan:

Foster Continual Economic Growth and Vitality
4.4 Invest in infrastructure to meet current and future needs

Deliver First Class Services to the Public and Our Customers
5.3 Ensure effective and efficient delivery of county services and support

 

Summary:

The purpose of this contract was for sidewalk improvements on Hercules Avenue North consisting of constructing ADA compliant sidewalks on both sides of Hercules Avenue North, piping existing ditches, pedestrian bridge, concrete box culvert extension, drainage, and intersection improvements from Sherwood Street to Sunset Point Road. The upgrades at the intersection of Hercules Avenue North and Calumet Street included traffic mast arms, pedestrian signals, crosswalks, and sidewalk ramps.

The City of Clearwater entered into a JPA with the County for the purpose of the County’s contractor performing the City’s utility replacement work as part of this contract. The City’s utility work consisted of the replacement of a twelve-inch (12") water main, eight-inch (8") water main, and eight-inch (8") gravity sanitary sewer pipe and associated manholes that were in conflict with the County’s project. The City’s portion of work came in less than originally anticipated via the JPA with the County in which funds will be returned to the City.

 

Background/Explanation:

The Board awarded the contract to Kamminga and Roodvoets, Inc. on April 7, 2020 in the amount of $2,742,317.04. The project was substantially complete on July 26, 2021, with final completion achieved on October 20, 2021. Final inspection for all work performed under the contract was conducted by representatives of the Public Works Construction Management Division.  The project required a 130-day extension due to unforeseen field conditions - liquidated damages are not assessed.

Public Works identified a need for sidewalk improvements during the Hercules Avenue North Phase I (CSXT tracks to Sherwood Street) construction, which was completed in 2017.  Phase II, from Sherwood Street to Sunset Point Road, includes sidewalk improvements along the north and south sides of Hercules Avenue North providing continuous connectivity and a safe walking environment compliant with current standards and ADA requirements. The intersection upgrades will improve safety, provide operational improvements, reduce the frequency of crashes, and provide pedestrian and bicyclist features. The overall project provides increased multimodal safety to motorists, pedestrians, and bicyclists.

 

Fiscal Impact:

Funding sources for construction of this project are:

 

FDOT Local Agency Program grant agreement:                     $1,443,956.00

Capital Improvement Program - Penny for Pinellas:                     $   749,918.04

JPA with the City of Clearwater for utility work:                                          $   548,443.00

 

Expenditure not to exceed:                                                                                                         $2,742,317.04

Decrease to due to Change Order No. 1:                                          $  (131,223.71)

Final Revised Total:                                                                                                                              $2,611,093.33

 

Delegated Authority:

Authority for the County Administrator to approve and execute this Change Order is granted under Code Section 2-62 (a)(3).

 

Staff Member Responsible:

Kelli Hammer Levy, Director, Public Works
Merry Celeste, Division Director, Purchasing & Risk, Administrative Services
Joe Lauro, Director, Administrative Services

 

Partners:

Florida Department of Transportation (FDOT)
City of Clearwater

 

Attachments:

Change Order No. 1 (final)