File #: 17-1677A    Version: 1
Type: Contract/Agreement Status: Passed
File created: 9/24/2017 Department: Public Works
On agenda: 1/9/2018 Final action: 1/9/2018
Title: Interlocal agreement with the City of St. Petersburg for Oak Street Drainage Improvements.
Attachments: 1. FE Interlocal Agreement with City of St Petersburg, 2. Transmittal Letter from St Petersburg for Agreements, 3. Partially signed interlocal agreement.pdf, 4. Location Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Subject:

Title

Interlocal agreement with the City of St. Petersburg for Oak Street Drainage Improvements.

label

 

Recommended Action:

Recommended Action

Approval of the Interlocal agreement with the City of St. Petersburg (City) for Oak Street Drainage Improvements for County funding not to exceed $700,000.00.

Chairman to sign and Clerk to attest.

County PID No. 003600A

Body

 

Strategic Plan:

Practice Superior Environmental Stewardship
3.3 Protect and improve the quality of our water, air, and other natural resources

Foster Continual Economic Growth and Vitality
4.2 Invest in communities that need the most

Deliver First Class Services to the Public and Our Customers
5.1 Maximize partner relationships and public outreach

 

Summary:

This interlocal agreement provides approximately 50% funding, for a not to exceed amount of $700,000.00, to the City for construction of drainage improvements along Oak Street beginning at Gandy Boulevard and continuing north along Oak Street NE to approximately 429 feet north of the 105th Terrace NE intersection.  The project area also includes a section beginning at the intersection of Oak Street NE and 105th Terrace NE, extending west 132 feet.

 

Background Information:

The purpose of this project is to alleviate flooding and drainage issues on the roadway and surrounding incorporated and unincorporated property within the project area.  Construction activities include the installation of approximately 1,568 linear feet of reinforced concrete pipe and elliptical reinforced concrete pipe, manholes, inlets, and other related drainage structures.  Drainage work will tie into an existing pipe network at the intersection of Gandy Boulevard and Oak Street NE.  Site restoration will include roadway, curb, sidewalk and other appurtenances.

This agreement remains in effect to December 31, 2019.

 

Fiscal Impact:

The City’s final construction cost estimate for the project is anticipated to be $1,421,623.33.  The County will provide approximately 50%, or an amount not to exceed $700,000.00, from the Infrastructure Sales Tax (Penny for Pinellas): Storm Sewer Rehab project, Drainage and Stormwater program allocation.  Funding is included in the FY18-27 Capital Improvement Plan and will be provided to the City on a reimbursement basis. The funding from each jurisdiction is apportioned based on the contributing drainage area within each of their respective boundaries/areas.

 

Staff Member Responsible:

Rahim Harji, P.E. Director, Public Works

 

Partners:

City of St. Petersburg

 

Attachments:

Agreement
Location Map