Legislation Details

File #: 26-1083A    Version: 1
Type: Contract/Agreement Status: Regular Agenda
File created: 6/25/2026 Department: Public Works
On agenda: 7/21/2026 Final action:
Title: State Funded County Incentive Grant Program Agreement and corresponding Resolution with the Florida Department of Transportation for construction activities of the Intelligent Transportation System/Advanced Traffic Management System on Duhme Road/113th Street from State Road 666/Tom Stuart Causeway to State Road 688/Ulmerton Road project.
Attachments: 1. Agreement, 2. Exhibit D - Resolution 26-, 3. Project Location Map, 4. Resolution 06-70, 5. Indeminification - FDOT Response, 6. OMB.REVIEW_26-1083A_CIGP_ATMS_004544A
Related files: 23-1980A

Subject:

Title

State Funded County Incentive Grant Program Agreement and corresponding Resolution with the Florida Department of Transportation for construction activities of the Intelligent Transportation System/Advanced Traffic Management System on Duhme Road/113th Street from State Road 666/Tom Stuart Causeway to State Road 688/Ulmerton Road project.

label

 

Recommended Action:

Recommended Action

Approval of the State Funded County Incentive Grant Program Agreement and corresponding Resolution with the Florida Department of Transportation (FDOT) for construction activities of the Intelligent Transportation System/Advanced Traffic Management System on Duhme Road/113th Street from State Road (SR) 666/Tom Stuart Causeway to SR 688/Ulmerton Road project.

 

                     Agreement amount is $2,932,400.00. FDOT maximum participation is $1,466,200.00; County match is $1,466,200.00.

                     Project construction funded in Fiscal Year (FY) 2027 and FY28.

                     County matching funds for Agreement and overall project are derived from the Local Option Fuel Tax.

                     Project will enhance flow of traffic by providing necessary surveillance of traffic conditions along roadway, and provide motorists with information for alerts, incidents and evacuations.

                     Funding is budgeted in the Capital Improvement Program, in the amount of $8,189,000.00, under project 004544A-ATMS 113th Street, funded by Local Option Fuel Tax and State Grant.

 

FDOT FPN 448509 1 54 01; PID No. 004544A; FDOT to fund $1,466,200.00 and County to fund $1,466,200.00 of the Agreement total of $2,932,400.00; Total construction cost estimate is $7,814,200.00; Agreement term ends July 17, 2028; Authorize the Chairman to sign and the Clerk of the Circuit Court to attest.

Body

 

Strategic Priorities:

Resilient Infrastructure and Environment
1.1 Improve traffic flow efficiency.
1.2 Maintain and enhance County infrastructure.
1.5 Strengthen resilience and adaptation.

Healthy and Safe Communities
2.1 Improve public health.
2.2 Enhance community safety.

 

Summary:

Summary

The Agreement, in the amount of $2,932,400.00, provides for FDOT’s maximum participation of $1,466,200.00, and a County match of $1,466,200.00.  Funding will be used for construction installation of ATMS/ITS on Duhme Road/113th Street from SR 666/Tom Stuart Causeway to SR 688/Ulmerton Road. The project will enhance flow of traffic by providing necessary surveillance of traffic conditions along roadways, and provide motorists with information for alerts, incidents and evacuations.  Total project length is approximately 5.883 miles.

Section 14 of the Agreement requires the County to indemnify and hold harmless the FDOT to the extent permitted by law as limited by and pursuant to the provisions of Section 768.28, Florida Statutes. County Resolution No. 06-70 prohibits the County from indemnifying others under most circumstances. FDOT will not modify the indemnification section of this Agreement as this is a standard requirement in their agreements. 

Body

 

Background Information:

The project is part of an overall implementation of the Countywide ATMS/ITS effort that was adopted and funded by the Board of County Commissioners (Board) utilizing the Ninth Cent Local Option Fuel Tax (LOFT) in 2006.  The project includes new installation of fiber optic cable, CCTV cameras, dynamic message signs (DMS) and adaptive vehicle detection systems at intersections.

 

Fiscal Impact:

Agreement amount is $2,932,400.00.  FDOT maximum participation is $1,466,200.00; County match is $1,466,200.00. County PID No. 004544A. County matching funds are derived from LOFT.  Construction is funded in FY 2027 and FY 2028.

 

County’s portion of total project cost including CIGP match:                                           $6,348,000.00

FDOT portion funded through the CIGP Agreement:                                                                       $1,466,200.00

Total construction cost estimate:                                                                                                                                      $7,814,200.00

 

Funding is budgeted in the Capital Improvement Program, in the amount of $8,189,000.00, under project 004544A-ATMS 113th Street, funded by Local Option Fuel Tax and State Grant.

 

 

Staff Member Responsible:

Kelli Hammer Levy, Director, Public Works

 

Partners:

FDOT

 