Type: Purchasing Delegated Item Status: Agenda Ready
File created: 8/13/2025 Department: Public Works
On agenda: 9/30/2025 Final action:
Title: Change Order No. 1 Final to the Agreement with Preferred Materials Inc. for Fiscal Year 2024 Pavement Preservation - Package 1.
Attachments: 1. CO1 23-0831 signed
Related files: 23-1648A
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Subject:

Title

Change Order No. 1 Final to the Agreement with Preferred Materials Inc. for Fiscal Year 2024 Pavement Preservation - Package 1.

label

 

Recommended Action:

Recommended Action

Approval and execution by the County Administrator of Change Order No. 1 Final with Preferred Materials Inc. for Fiscal Year (FY) 2024 Pavement Preservation - Package 1.

 

                     The proposed FY24 Pavement Preservation Package 1 contract consists of milling and resurfacing, pavement marking, detector loops and traffic control required to complete the four projects

o                     Bryan Dairy Road (72nd Street - U.S.19 in Largo/Pinellas Park)

o                     Local Group 145 (82nd Avenue North - 90th Avenue North in Seminole)

o                     Local Group 94 (71st Street North - 62nd Street North in Pinellas Park)

o                     Local Group 62 (CR 1 - Foxcroft Drive East in Palm Harbor).

                     The project was substantially complete on December 15, 2024, and obtained final completion on May 22, 2025. Liquidated damages do not apply, as the county received substantial and beneficial use on December 15, 2024. Representatives of the Public Works Construction Management Division conducted final inspections of the project for all work performed under the contract.

                     Final quantities have been tabulated, resulting in a net decrease of ($352,923.40).

                     Funding for this agreement is reflected in the FY25 Capital Budget, budgeted under the Road Resurfacing & Rehabilitation PIV Project 004192A, funded by the Penny for Pinellas, and the Transportation Millage Capital Resurfacing Program Project 005700A, funded by the Transportation Millage.

 

Contract No. 23-0831-ITB-C decreased in the amount by ($352,923.40) for a revised total of $3,583,469.60.

Body

 

Strategic Plan:

Resilient Infrastructure and Environment
1.1 Improve traffic flow efficiency
1.2 Maintain and enhance County infrastructure

 

Summary:

Summary

The project was substantially complete on December 15, 2024, and obtained final completion on May 22, 2025. Liquidated damages do not apply, as the county received substantial and beneficial use on December 15, 2024. Representatives of the Public Works Construction Management Division conducted final inspections of the project for all work performed under the contract. All work has been completed in accordance with the construction contract documents. The time between substantial and final completion accounts for the duration to complete the walk-through inspections with project stakeholders, completion of punch list items, final testing, project acceptance, and receipt of final invoice and closeout documents. Final quantities have been tabulated resulting in a net decrease of ($352,923.40). This is the difference between estimated and final quantities and the balance of unspecified work not used.

Body

 

Background Information:

The proposed FY2024-Pavement Preservation Package 1 contract consists of milling and resurfacing, pavement marking, detector loops and traffic control required to completed four (4) projects.

 

Fiscal Impact:

Original Agreement Amount: $3,936,393.00

Decrease due to Change Order No. 1: (-$352,923.40)

Revised Agreement Amount: $3,583,469.60

 

Funding for subprojects, Bryan Dairy (Resurfacing) from 72nd St N to US Hwy 19 Project 004603A, Local Group 145 Resurfacing (91st St N & 85th Ave N) Project 005637A, Local Group 94 Resurfacing Project 005695A, and Local Group 62 Resurfacing (Foxboro Dr & Hammock Dr) Project 005632A is reflected in the FY25 Capital Budget, budgeted under the Road Resurfacing & Rehabilitation PIV Project 004192A, funded by the Penny for Pinellas, and the Transportation Millage Capital Resurfacing Program Project 005700A, funded by the Transportation Millage.

 

Delegated Authority:

Authority for the County Administrator to approve and execute this change order is granted under Code Section 2-62(a)(3).

 

Staff Member Responsible:

Kelli Hammer Levy, Director, Public Works
Merry Celeste, Purchasing Director, Administrative Services
Joe Lauro, Director, Administrative Services

 

Partners:

N/A

 

Attachments:

Change Order No. 1 Final