Title: Local Agency Grants Program application with Forward Pinellas, related Florida Department of Transportation Project Application and Resolution for the Sunset Point Road Improvement Project from Kings Highway to Keene Road.
Attachments: 1. Adopted RES 24-85, 2. FE_AATF - FDOT 2025 Project Application, 3. AATF - FDOT 2025 Project Application, 4. AATF_FDOT 2025 Project Application, 5. Grant Application, 6. Resolution, 7. Project Location Map, 8. OMB Approval Intent to Apply

Subject:

Title

Local Agency Grants Program application with Forward Pinellas, related Florida Department of Transportation Project Application and Resolution for the Sunset Point Road Improvement Project from Kings Highway to Keene Road.

label

 

Recommended Action:

Recommended Action

Approval of the Local Agency Grants Program application with Forward Pinellas, related to the Florida Department of Transportation (FDOT) Project Application, and adoption of related Resolution for the Sunset Point Road Improvement Project from Kings Highway to Keene Road.

 

                     The grant funding requested is $3,000,000.00 for Fiscal Year (FY) 2030, which is anticipated to be 33% of the project cost.

                     There is no required grant match, and the application is for the maximum grant amount of $3,000,000.00.

                     The project is identified in the Forward Pinellas Long Range Transportation Plan 2045 Cost Feasible Roadway Projects and proposed FY30 Capital Improvement Plan (CIP).

                     Request signature on FDOT Project Application and adoption of related Resolution.

                     Public Works Director will electronically submit Grant Application. No signature is required.

                     Deadline for application submittal to Forward Pinellas is November 22, 2024.

                     Construction funding in the amount of $6,124,600.00, along with the grant, if awarded, will be provided in future CIP.

 

PID No. 003877A; Total project design and construction cost approximately $9,124,600.00; Anticipated grant funding request is $3,000,000.00; Authorize the Chairman to sign and the Clerk of the Circuit Court to attest.

Body

 

Strategic Plan:

Ensure Public Health, Safety, and Welfare
2.5 Enhance pedestrian and bicycle safety

Foster Continual Economic Growth and Vitality
4.4 Invest in infrastructure to meet current and future needs
4.5 Provide safe and effective transportation systems to support the efficient flow of motorists, commerce, and regional connectivity

 

Summary:

Summary

The Local Agency Grants Program application with Forward Pinellas, if approved, will provide funds to be used for the design and construction of improvements on Sunset Point Road from Kings Highway to Keene Road. Total construction cost is anticipated to be $9,124,600.00.  Funding is for design and construction of the Sunset Point Road Improvements Project. Improvements include sidewalks on both the north and south side of the road. The roadway width will be revised to include a center two-way left turn lane. Sharrow pavement markings will be provided for bicyclists in the roadway driving lanes.

Body

 

Background Information:

The Local Agency Grants Program is a competitive program with the intent of assisting communities in meeting their goals for mobility and safe access for all users, regardless of mode of transportation, age, or physical ability. These programs provide direct funding for local transportation projects that demonstrate a strong link to redevelopment, economic opportunity, and better accessibility for all roadway users. The Sunset Point Road Improvement Project is part of the Forward Pinellas Long Range Transportation Plan 2045 Cost Feasible Roadway Projects list.

 

Fiscal Impact:

Construction funding for this project is not reflected in the FY25-FY30 Capital Improvement Plan. Construction funding will need to be in place in before a grant can be awarded.

 

Staff Member Responsible:

Kelli Hammer Levy, Director, Public Works

 

Partners:

FDOT
Forward Pinellas

 

Attachments:

FDOT 2025 Project Application
Grant Application
Resolution
Project Location Map
OMB Approval Intent to Apply email