File #: 16-202A    Version: 1
Type: Contract/Agreement Status: Passed
File created: 2/4/2016 Department: Solid Waste
On agenda: 7/19/2016 Final action: 7/19/2016
Title: Award of bid to Eau Gallie Electric, Inc. for the Uninterruptible Power Source Project at the Solid Waste Industrial Water Treatment Facility.
Attachments: 1. FE Agreement with Eau Gallie Electric Inc, 2. Project Location Map, 3. Bid Tabulation, 4. Agreement
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Subject:

Title

Award of bid to Eau Gallie Electric, Inc. for the Uninterruptible Power Source Project at the Solid Waste Industrial Water Treatment Facility.

label

Recommended Action:

Recommended Action

Approve the award of bid to Eau Gallie Electric, Inc. for the Uninterruptible Power Source (UPS) project at the Solid Waste Industrial Water Treatment Facility (Facility).

Bid no. 156-0247-CP(DF) in the amount of $639,545.00 on the basis of being the lowest, responsive, responsible bid meeting specifications.  All work is expected to be completed within one hundred eighty (180) consecutive calendar days.  Chairman to sign and Clerk of Court to attest.

Body

Strategic Plan:

Practice Superior Environmental Stewardship
3.4 Reduce/reuse/recycle resources including energy, water, and solid waste

Foster Continual Economic Growth and Vitality
4.4 Invest in infrastructure to meet current and future needs

 

Summary:

The purpose of this project is to provide and install a 750 kilo volt amp UPS with internal flywheel and associated equipment and controls.  The UPS will provide a level of protection to Facility components against power anomalies that can disrupt operations and potentially harm sensitive treatment equipment.

 

Background Information:

The Facility began full-scale operation in April 2013. The Facility has had issues in the past regarding power surges causing disruption to operations. During the summer, it is common for power to be disrupted multiple times in one day causing constant reset and restart of equipment, which may take up to two (2) hours each time potentially reducing the expected life of equipment. The UPS will remedy these concerns while also increasing the expected life of Facility equipment.

 

Fiscal Impact:

Expenditure not to exceed: $639,545.00

 

Funding is derived from the Solid Waste Enterprise Fund.

 

Staff Member Responsible:

Kelsi Oswald, Director, Solid Waste
Joe Lauro, Director, Utilities

 

Partners:

N/A

 