Legislation Details

File #: 26-0804D    Version: 1
Type: Delegated Item Status: Final
File created: 9/21/2026 Department: Public Works
On agenda: 10/27/2026 Final action: 9/30/2026
Title: Promoting Resilient Operations for Transformative, Efficient, and Cost-saving Transportation Program Grant Application to the United States Department of Transportation for the San Martin Boulevard Bridge Replacement Project.
Attachments: 1. San Martin Blvd Bridge Grant Application, 2. OMB Intent to Apply, 3. Project Location Map, 4. OMB.REVIEW_26-0804D_Project_001036A_Budget_Detail_Report.pdf, 5. OMB.REVIEW_26-0804D_PROTECT_USDOT_SanMartin_GrantApp.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Subject:

Title

Promoting Resilient Operations for Transformative, Efficient, and Cost-saving Transportation Program Grant Application to the United States Department of Transportation for the San Martin Boulevard Bridge Replacement Project.

label

         

Recommended Action:

Recommended Action

Approval and execution by the County Administrator for the Promoting Resilient Operations for Transformative, Efficient, and Cost-saving Transportation Program (PROTECT) Grant Application to the United States Department of Transportation (USDOT) for the San Martin Boulevard Bridge Replacement Project.

 

•                     The total estimated construction cost is $31,358,000.00.

•                     Requested grant funding is $24,236,400.00 (77%) of the total estimated construction cost; anticipated County match is $6,271,600.00 (20%) of the total estimated construction cost.

•                     Total federal funds for federal grant programs cannot exceed 80% of total cost. San Martin Bridge Replacement has received $850,000.00 (3%) in federal earmarks. If awarded grant funds, total federal funding on project will be $25,086,400.00 (80%)

•                     County Administrator to approve and sign application for submission on behalf of Board County Commissioners. Final completed grant application will be on a Board agenda item for ratification on a future date.

•                     Funding for grant application budgeted in Capital Improvement Plan, under San Martin Boulevard over Riviera Bay, is currently funded by the Local Option Sales Surtax (Penny for Pinellas).

•                     Application deadline for submission is October 9, 2026.

•                     Funding for this project is budgeted under the San Martin Blvd. over Riviera Bay Bridge Replacement PID 001036A, included in the Capital Improvement Plan, funded by the Penny for Pinellas and a federal earmark.

 

County PID: 001036A; Total project construction cost is approximately $31,358,000.00, with anticipated grant funding being $24,236,400.00; County match is $6,271,600.00; Authorize the County Administrator to approve, sign, and submit the Grant Application on behalf of the Board.

Body

 

Strategic Priorities:

Healthy and Safe Communities
2.2 Enhance community safety.

Smart Service Delivery
4.4 Pursue continuous improvement.

 

Summary:

The County Administrator is authorizing approval and submittal of the Grant Application for the San Martin Boulevard Bridge Replacement Project due to time constraints.  The final completed Grant Application will be on a Board agenda item for ratification on a future date.

The San Martin Boulevard Bridge was constructed in 1962 and is nearing the end of its service life. Additionally, the Bridge does not have bike lanes or sidewalks, and it no longer meets current design standards or Americans with Disabilities Act (ADA) requirements. Replacing the Bridge is necessary to address these deficiencies. The new bridge will have a similar design and will be constructed just east of the existing one.

 

Background/Explanation:

The Infrastructure Investment and Jobs Act established the PROTECT grant program to help make surface transportation more resilient to natural hazards through support of planning activities and improvements to evacuation routes and at-risk coastal infrastructure.

 

Fiscal Impact:

Total construction cost of the project is approximately $31,358,000.00. Requested PROTECT funding is $24,236,400.00 (77%). Anticipated County match is $6,271,600.00 (20%). Additionally, the County has received a federal earmark of $850,000.00 (3%). If awarded grant funds, total federal funding on project will be $25,086,400.00 (80%).

 

Funding for this project is budgeted under the San Martin Blvd. over Riviera Bay Bridge Replacement PID 001036A, included in the Capital Improvement Plan, funded by the Penny for Pinellas and a federal earmark. Total available funding is the amount of the project allocation as represented in the FY27-FY32 Capital Improvements Program. Available funding in excess of the recommended not-to-exceed amount is available for other project costs.

 

Delegated Authority:

Authority for the County Administrator to approve, sign, and submit this Application on behalf of the Board is requested.  The Board will ratify approval of this item with the finalized Grant Application at a future Board meeting.

 

Staff Member Responsible:

Kelli Hammer Levy, Director, Public Works

 

Partners:

USDOT

 

Attachments:

Grant Application
OMB Intent to Apply
Project Location Map