Legislation Details

File #: 25-0073D    Version: 1
Type: Purchasing Delegated Item Status: Agenda Ready
File created: 1/22/2025 Department: Economic Development
On agenda: 3/31/2025 Final action: 2/8/2025
Title: Emergency repair with IPS PowerServe to Replace damaged C3 and C4 West Transformers at the Star Center.
Attachments: 1. 40025705-7A Quote, 2. OMB.REVIEW_25-0073D_PCED_Star.Center.EM.PO_24-JAN-2025, 3. COI,-a-_Integrated-Powe_24-25-GL-AL-UMB_7-1-2024_1541835956
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Subject:

Title

Emergency repair with IPS PowerServe to Replace damaged C3 and C4 West Transformers at the Star Center.

label

 

Recommended Action:

Recommended Action

Approval by the County Administrator of the emergency purchase/repair with IPS PowerServe to replace damaged C3 and C4 West Transformers at the Star Center.

 

•                     This is an emergency purchase request to replace the damaged C3 and C4 West Transformers $318,715.00.

•                     While performing scheduled testing during the Young-Rainey STAR Center triennial shutdown the IPS team tested the four transformers serving switchgear C-3 and C-4. Transformers C-3 west and C-4 west both failed and cannot be put in service both testing at the bottom of the acceptable range of operation.  This PO request is to replace the C3-west and C-4 west transformers only.

•                     The County Administrator is authorized to approve emergency purchases under Code Section 2-181.

 

Bid No. 25-0310-E, emergency in the amount of $318,715.00.

Body

 

Strategic Plan:

Foster Continual Economic Growth and Vitality
4.4 Invest in infrastructure to meet current and future needs

Deliver First Class Services to the Public and Our Customers
5.1 Maximize partner relationships and public outreach
5.2 Be responsible stewards of the public’s resources
5.3 Ensure effective and efficient delivery of county services and support
5.4 Strive to exceed customer expectations

 

Summary:

Summary

This is an emergency request to replace the damaged C3 and C4 West Transformers for Star Center, there is no other reliable redundancy equipment in place, and there is a long lead time for the equipment replacement - approximately 12-weeks following issuance of a purchase order.

Body

 

Background Information:

While performing scheduled testing during the Young-Rainey STAR Center triennial shutdown the IPS team tested the four transformers serving switchgear C-3 and C-4. Transformers C-3 west and C-4 west both failed and cannot be put in service. 

Transformers C-3 east and C-4 east both tested at the bottom of the acceptable range of operation. To validate results, testing was performed a second time utilizing different testing equipment. This condition results in an unacceptable risk of failure condition that would impact a large portion of the STAR Center facility.  This PO request is to replace the C3-west and C-4 west transformers only. These transformers were previously tested during the 2021 shutdown and no discrepancies were noted.

 

Fiscal Impact:

Not to exceed: $318,715.00

$289,715.00 quote

$29,000.00 contingency

 

 

Delegated Authority:

Authority for the County Administrator to approve this emergency purchase is granted under Code Section 2-181.

 

Staff Member Responsible:

Cynthia Johnson, Director, Economic Development
Merry Celeste, Purchasing Director, Administrative Services
Joe Lauro, Director, Administrative Services

 

Partners:

N/A

 

Attachments:

Quote