Title: Change Order No. 1 to the emergency purchase with Cone & Graham Inc. for Lake Seminole concrete weir emergency protective measures due to Hurricane Helene
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Subject:

Title

Change Order No. 1 to the emergency purchase with Cone & Graham Inc. for Lake Seminole concrete weir emergency protective measures due to Hurricane Helene

label

         

Recommended Action:

Recommended Action

Approval by the County Administrator of Change Order No.1 to the emergency purchase with Cone & Graham Inc. for emergency protective measures at the Lake Seminole concrete weir due to damages caused by Hurricane Helene

 

•                     This request is for emergency protective measures related to the failed Lake Seminole concrete weir caused by storm surge from Hurricane Helene.

•                     The work is being completed as time and materials given the unknowns with the rock layer, the amount of stabilization that will be needed to the temporary sheet pile wall and the removal of the old, failed concrete wall which is becoming difficult to remove.

•                     The emergency repairs were necessary to stabilize the area to protect Park Boulevard, the box culvert, a 36” sewer force main, a 24” potable water line, and other infrastructure. 

•                     This emergency request is to increase the contract amount by $760,000.00 for a revised not-to-exceed amount of $1,560,000.00.

•                     Funding for this contract has been made available from reserves for Hurricane Helene recovery. A portion of the costs incurred will likely be offset with reimbursement from the Federal Emergency Management Agency and the State of Florida.

 

Contract No. 25-00018-E in the increase of $760,000.00 for a revised not-to-exceed amount of $1,560,000.00.

,Body

 

Strategic Plan:

Ensure Public Health, Safety, and Welfare
2.1 Provide planning, coordination, prevention, and protective services to ensure a safe and secure community
Deliver First Class Services to the Public and Our Customers
5.3 Ensure effective and efficient delivery of county services and support

 

Summary:

Approval of emergency protective measures for the Lake Seminole concrete weir caused by Hurricane Helene.  The work is being completed as time and materials given the unknowns with the rock layer, the amount of stabilization that will be needed to the temporary sheet pile wall and the removal of the old, failed concrete wall which is becoming difficult to remove.

 

Background/Explanation:

Public Works requested funding for emergency protective measures to install temporary repairs to the Lake Seminole weir. Storm surge from Hurricane Helene caused significant damage to the weir ultimately resulting in the collapse of the structure. The emergency repairs were necessary to stabilize the situation to protect Park Blvd, the box culvert, a 36” sewer force main, a 24” potable water line, and other infrastructure. 

 

Fiscal Impact:

 

Original Contract amount:                                                                                                                                 $800,000.00

                     Increase due to Change Order No. 1:                                                                  $760,000.00

Revised not-to-exceed amount:                                                                                                         $1,560,000.00

 

Funding for this contract has been made available from reserves for Hurricane Helene recovery. A portion of the costs incurred will likely be offset with reimbursement from the Federal Emergency Management Agency and the State of Florida.

 

 

Delegated Authority:

Authority for the County Administrator to approve this emergency purchase is granted under Code Section 2-181.

 

Staff Member Responsible:

Kelli Hammer Levy, Director, Public Works
Merry Celeste, Purchasing Director, Administrative Services
Joe Lauro, Director, Administrative Services

 

Partners:

N/A

 

Attachments:

Quote’s