Pinellas County Florida Banner
File #: 22-1939A    Version: 1
Type: Contract/Agreement Status: Passed
File created: 10/19/2022 Department: Public Works
On agenda: 11/15/2022 Final action: 11/15/2022
Title: Multimodal priority list application for the Belleair Road Multimodal Improvement Project to receive federal and/or state grant funding administered through Forward Pinellas for construction.
Attachments: 1. FE_AATF'd FDOT Grant Application 110322, 2. AATF'd FDOT Grant Application 110322.pdf, 3. FDOT Grant Application, 4. Forward Pinellas Multimodal Priority List Cover Letter, 5. Project Location Map and Scope of Work, 6. OMB Intent to Apply Email, 7. OMB.Contract.RVW-PW-22-1939A.BelleairMultimodal

Subject:

Title

Multimodal priority list application for the Belleair Road Multimodal Improvement Project to receive federal and/or state grant funding administered through Forward Pinellas for construction.

label

 

Recommended Action:

Recommended Action

Approval of the multimodal priority list application for the Belleair Road Multimodal Improvement Project to receive federal and/or state grant funding administered through Forward Pinellas for construction.

 

                     Project includes safety improvements including medians, dedicated left turn lanes, and a trail connection from Duke Energy Trail to Eagle Lake Park.

                     Application for placement on Forward Pinellas multimodal priority list in a five-year Florida Department of Transportation (FDOT) work program.  

                     Deadline for grant submittal to Forward Pinellas is December 16, 2022.

                     Board Chair to sign FDOT 2022 Consolidated Project application, which Forward Pinellas will submit on a later date.

                     County match is funded from Local Infrastructure Sales Surtax (Penny for Pinellas) in Project 003862A Belleair Rd. Roadway Improvements from U.S. Highway 19 to Keene Road.

 

PID No. 003862A; Grant application in the amount of $3,550,000.00; County match is $10,650,000.00; total construction cost is $14,200,000.00.

Body

 

Strategic Plan:

Ensure Public Health, Safety, and Welfare
2.5 Enhance pedestrian and bicycle safety

Foster Continual Economic Growth and Vitality
4.4 Invest in infrastructure to meet current and future needs
4.5 Provide safe and effective transportation systems to support the efficient flow of motorists, commerce, and regional connectivity

 

Summary:

Summary

This action certifies the County’s application for the Forward Pinellas Multimodal Priority List. Forward Pinellas will then submit the signed 2022 Consolidated Project Application to FDOT for Surface Transportation Block Grant funding consideration in Fiscal Year 2028. Funding, if received, will be used toward construction of the Belleair Road Multimodal Improvement Project. The proposed project includes the addition of medians, dedicated left turn lanes to reduce traffic backup and rear-end collisions, and a trail connection from the Duke Energy Trail to Eagle Lake Park and the City of Largo’s trail system.

Body

 

Background Information:

A feasibility study was completed in 2019 by the consulting firm, HNTB Corporation, which addressed transportation needs and upcoming drainage projects. As part of the current design phase, Fiscal Years 2023 to 2025, the proposed alternatives will be refined with the community and cities of Clearwater and Largo for a best fit of this corridor, while increasing the safety of all modes of travel.

Funding for the Multimodal Priority List is administered through Forward Pinellas, the County’s metropolitan planning organization. The Multimodal Priority List is for projects seeking a wide array of federal and state funding sources that support and reinforce the Countywide Land Use Plan through their implementation. Projects selected to advance will be considered for addition to the FDOT Five Year Work Program.

 

Fiscal Impact:

Grant funding requested is $3,550,000.00. A County match of $10,650,000.00 is included in the Capital Improvement Program Six Year Plan Fiscal Years 2023 - 2028 in PID No. 003862A Belleair Rd. Roadway Improvements from US Hwy 19 to Keene Rd. Total construction estimate is $14,200,000.00.

 

Staff Member Responsible:

Kelli Hammer Levy, Director, Public Works

 

Partners:

FDOT
Forward Pinellas

 

Attachments:

FDOT Grant Application
Forward Pinellas Multimodal Priority List Cover Letter
Project Location Map and Scope of Work
OMB Intent to Apply Email